A Partial Listing of Recent Projects
Hydrology/Fluvial Geomorphology Projects
(map of watersheds with assessments by Apex):
Glade Creek Hydrogeomophic Assessment (2016). Prepared for Kalesnikoff Lumber Co. Ltd (Thrums, BC) and Atco Wood Products Ltd. (Fruitvale, BC).
- Crawford Creek Hydrological and Geomorphological investigation (2015). Prepared for Eastshore Freshwater Habitat Society.
- Redfish Creek Hydrogeomorphic Assessment (2015). Prepared for Kalesnikoff Lumber Co. Ltd., Thrums, BC.
- Italy-Sutherland Hydrogeomorphic Assessment (2014). Prepared for Interfor and IS Forestry, Castlegar, B.C.
Duhamel Creek Hydrogeomorphic Risk Assessment (2015). Prepared for Kalesnikoff Lumber Co. Ltd., Thrums BC.
Query Creek Hydrogeomorphic Risk Assessment (2014). Prepared for Atco Forest Products, Fruitvale, BC.
- Syncrude Fort Hill North Swale design (2013). Prepared for Terra Erosion Control, Nelson, BC.
- Rosebury Creek Hydrological Assessment (2013). Prepared for Pearkes and Fernandez Law. Nelson BC.
- Pedro Creek Hydrogeomorphic Assessment (2013). Prepared for Slocan Integrated Forestry Cooperative, Winlaw. BC.
- Hydrogeomorphic Partial Risk Assessment of proposed development on Kimberley and Lois Creeks (2013). Prepared for Canfor, Elko BC.
- Englishman Creek Hydrogeomorphic Assessement (2012). Prepared for Canfor, Cranbrook BC.
- Deer Creek Large Woody Debris Removal Assessment (2012). Prepared for Regional District of Central Kootenay, Nelson BC.
- Greenhills Creek Restoration Proposal (2011). Joint project with Terra Erosion Control Ltd. Prepared for Teck Greenhills Ltd., Elkford, BC.
- Hyrological Risk Analysis for Etna Creek, Braunagel Creek and No Name North and South Creeks (2011). Prepared for Tembec, Kootenay South Division, Cranbrook B.C
- Leigh Brook Hydrogeomorphic Assessement (2010). Prepared for Kalso Community Forest, Kalso, BC.
- Leigh Brook Hydrogeomorphic Assessement (2010). Prepared for Kalso Community Forest, Kalso, BC.
- Trozzo Creek Hydrologic Review (2010). Prepared for Slocan Integral Forestry Cooperative, Winlaw, BC.
Terrain Stability/Geotechnical
- Duhamel channel and slide assessment (2013). Prepared for Kalesnikoff Lumber Co. Ltd. Thrums. BC.
- Carmichael Creek Debris Flood Investigation (2013). Prepared for Napora Law, Nelson B.C.
- Detailed terrain stability field assessment TSL A9048, Lavington Creek Area (82K010, 82J001) (2013). Prepared for Maple Leaf Forestry Ltd. East Kootenay Field Unit.
- Detailed Terrain Stability Assessment for A20213 CP107 BLK 188 Topaz Creek area (082F017) (2012) Prepared for Hushcroft Lumber Ltd., Creston BC
- Detailed Terrain Stability Field Assessment Tembec Industries, Cranbrook Division Portions of proposed road (R04814 Sec C) in the Birch Creek Drainage (CP 183) (2012). Tembec, Cranbrook BC.
- Teck Greenhills Operation, Gully Remediation (2011) Prepared in partnership with Terra Erosion Control Ltd for Teck Greenhills, Elkford B.C.
- Kemess South Mine, British Columbia, Dam Face Erosion Repairs and Borrow Pit #10 Drain Construction (2010). Prepared in partnership with Terra Erosion Control Ltd. For Kemess Mines, Kemess BC.
- Detailed Terrain Stability Field Assessment, Upper Rover Creek Area. CP 44 Blocks 1 and 2. (2010). Prepared for Kalesnikoff Lumber Co. Ltd., Thrums BC.
- Detailed Terrain Stability Field Assessment, Duhamel Creek Area, Road 300 and Spur 310 CP 40 (2010). Prepared for Kalesnikoff Lumber Co. Ltd., Thrums, BC.
Hydroecology-Riparian
- Green, K.C. (2012). Detailed Riparian Assessment For Kalesnikoff Lumber Co. Ltd. West Kootenay Operating area. Prepared for Kalesnikoff Lumber Co. Ltd., Thrums, B.C.
- Green, K.C. (2010) Integrated Riparian Assessment for Kalesnikoff Lumber Co. Ltd. In the Kootenay Lake – Arrow operating area. Prepared for Kalesnikoff Lumber Co. Ltd. Thrums B.C.
- Forsite, Apex Geoscience and Interior Reforestation (2009). Integrated Riparian Assessment for the Invermere TSA. Volume 1: Strategic Overview. Prepared for Canfor, Radium Division and B.C. Timber Sales.
- Green, K.C. (2008). Integrated Riparian Assessment For Tembec in the East Kootenay, British Columbia Operating Areas: Volume 2: Detailed Riparian Assessment for the Northern Purcell Region. Prepared for Tembec Inc. Cranbrook, B.C.
- Green, K.C. (2008). Integrated Riparian Assessment For Tembec in the East Kootenay, British Columbia Operating Areas: Volume 3: Detailed Riparian Assessment for the South Purcell Region. Prepared for Tembec Inc., Cranbrook, B.C.
Green, K.C. (2008). Integrated Riparian Assessment For Tembec in the East Kootenay, British Columbia Operating Areas: Volume 4: Detailed Riparian Assessment for the Central Purcell Region. Prepared for Tembec Inc., Cranbrook, B.C. (http://www.for.gov.bc.ca/hfd/library/FIA/2009/LBIP_4885004d.pdf)
- Green, K.C. (2008). Integrated Riparian Assessment For Tembec in the East Kootenay, British Columbia Operating Areas: Volume 5: Detailed Riparian Assessment for the Central Rocky Mountain Region. Prepared for Tembec Inc.,Cranbrook, B.C.
- Green, K.C. (2008). Integrated Riparian Assessment For Tembec in the East Kootenay, British Columbia Operating Areas: Volume 6: Detailed Riparian Assessment for the North Elk Region. Prepared for Tembec Inc., Cranbrook, B.C.
Green, K.C. (2008). Integrated Riparian Assessment For Tembec in the East Kootenay, British Columbia Operating Areas: Volume 7: Detailed Riparian Assessment for the South Elk Region. Prepared for Tembec Inc., Cranbrook, B.C. (http://www.for.gov.bc.ca/hfd/library/FIA/2009/LBIP_4885004g.pdf)
Forsite, Apex Geoscience and Pandion Ecological Research Ltd (2006). Integrated Riparian Assessment for Tembec in the East Kootenay, British Columbia Operating Areas: Volume 1: Strategic Overview & Budget Calculations. Prepared for Tembec Inc. Cranbrook BC (http://www.for.gov.bc.ca/hfd/library/FIA/2006/LBIP_4439003.pdf)