A Partial Listing of Recent Projects

Hydrology/Fluvial Geomorphology Projects

(map of watersheds with assessments by Apex):

  • Glade Creek Hydrogeomophic Assessment (2016). Prepared for Kalesnikoff Lumber Co. Ltd (Thrums, BC) and Atco Wood Products Ltd. (Fruitvale, BC).

  • Crawford Creek Hydrological and Geomorphological investigation (2015). Prepared for Eastshore Freshwater Habitat Society.
  • Redfish Creek Hydrogeomorphic Assessment (2015). Prepared for Kalesnikoff Lumber Co. Ltd., Thrums, BC.
  • Italy-Sutherland Hydrogeomorphic Assessment (2014). Prepared for Interfor and IS Forestry, Castlegar, B.C.
  • Duhamel Creek Hydrogeomorphic Risk Assessment (2015). Prepared for Kalesnikoff Lumber Co. Ltd., Thrums BC.

  • Query Creek Hydrogeomorphic Risk Assessment (2014). Prepared for Atco Forest Products, Fruitvale, BC.

  • Syncrude Fort Hill North Swale design (2013). Prepared for Terra Erosion Control, Nelson, BC.
  • Rosebury Creek Hydrological Assessment (2013). Prepared for Pearkes and Fernandez Law. Nelson BC.
  • Pedro Creek Hydrogeomorphic Assessment (2013). Prepared for Slocan Integrated Forestry Cooperative, Winlaw. BC.
  • Hydrogeomorphic Partial Risk Assessment of proposed development on Kimberley and Lois Creeks (2013). Prepared for Canfor, Elko BC.
  • Englishman Creek Hydrogeomorphic Assessement (2012). Prepared for Canfor, Cranbrook BC.
  • Deer Creek Large Woody Debris Removal Assessment (2012). Prepared for Regional District of Central Kootenay, Nelson BC.
  • Greenhills Creek Restoration Proposal (2011). Joint project with Terra Erosion Control Ltd. Prepared for Teck Greenhills Ltd., Elkford, BC.
  • Hyrological Risk Analysis for Etna Creek, Braunagel Creek and No Name North and South Creeks (2011). Prepared for Tembec, Kootenay South Division, Cranbrook B.C
  • Leigh Brook Hydrogeomorphic Assessement (2010). Prepared for Kalso Community Forest, Kalso, BC.
  • Leigh Brook Hydrogeomorphic Assessement (2010). Prepared for Kalso Community Forest, Kalso, BC.
  • Trozzo Creek Hydrologic Review (2010). Prepared for Slocan Integral Forestry Cooperative, Winlaw, BC.

Terrain Stability/Geotechnical

  • Duhamel channel and slide assessment (2013). Prepared for Kalesnikoff Lumber Co. Ltd. Thrums. BC.
  • Carmichael Creek Debris Flood Investigation (2013). Prepared for Napora Law, Nelson B.C.
  • Detailed terrain stability field assessment TSL A9048, Lavington Creek Area (82K010, 82J001) (2013). Prepared for Maple Leaf Forestry Ltd. East Kootenay Field Unit.
  • Detailed Terrain Stability Assessment for A20213 CP107 BLK 188 Topaz Creek area (082F017) (2012) Prepared for Hushcroft Lumber Ltd., Creston BC
  • Detailed Terrain Stability Field Assessment Tembec Industries, Cranbrook Division Portions of proposed road (R04814 Sec C) in the Birch Creek Drainage (CP 183) (2012). Tembec, Cranbrook BC.
  • Teck Greenhills Operation, Gully Remediation (2011) Prepared in partnership with Terra Erosion Control Ltd for Teck Greenhills, Elkford B.C.
  • Kemess South Mine, British Columbia, Dam Face Erosion Repairs and Borrow Pit #10 Drain Construction (2010). Prepared in partnership with Terra Erosion Control Ltd. For Kemess Mines, Kemess BC.
  • Detailed Terrain Stability Field Assessment, Upper Rover Creek Area. CP 44 Blocks 1 and 2. (2010). Prepared for Kalesnikoff Lumber Co. Ltd., Thrums BC.
  • Detailed Terrain Stability Field Assessment, Duhamel Creek Area, Road 300 and Spur 310 CP 40 (2010). Prepared for Kalesnikoff Lumber Co. Ltd., Thrums, BC.

Hydroecology-Riparian

  • Green, K.C. (2012). Detailed Riparian Assessment For Kalesnikoff Lumber Co. Ltd. West Kootenay Operating area. Prepared for Kalesnikoff Lumber Co. Ltd., Thrums, B.C.
  • Green, K.C. (2010) Integrated Riparian Assessment for Kalesnikoff Lumber Co. Ltd. In the Kootenay Lake – Arrow operating area. Prepared for Kalesnikoff Lumber Co. Ltd. Thrums B.C.
  • Forsite, Apex Geoscience and Interior Reforestation (2009). Integrated Riparian Assessment for the Invermere TSA. Volume 1: Strategic Overview. Prepared for Canfor, Radium Division and B.C. Timber Sales.
  • Green, K.C. (2008). Integrated Riparian Assessment For Tembec in the East Kootenay, British Columbia Operating Areas: Volume 2: Detailed Riparian Assessment for the Northern Purcell Region. Prepared for Tembec Inc. Cranbrook, B.C.
  • Green, K.C. (2008). Integrated Riparian Assessment For Tembec in the East Kootenay, British Columbia Operating Areas: Volume 3: Detailed Riparian Assessment for the South Purcell Region. Prepared for Tembec Inc., Cranbrook, B.C.
  • Green, K.C. (2008). Integrated Riparian Assessment For Tembec in the East Kootenay, British Columbia Operating Areas: Volume 4: Detailed Riparian Assessment for the Central Purcell Region. Prepared for Tembec Inc., Cranbrook, B.C. (http://www.for.gov.bc.ca/hfd/library/FIA/2009/LBIP_4885004d.pdf)

  • Green, K.C. (2008). Integrated Riparian Assessment For Tembec in the East Kootenay, British Columbia Operating Areas: Volume 5: Detailed Riparian Assessment for the Central Rocky Mountain Region. Prepared for Tembec Inc.,Cranbrook, B.C.
  • Green, K.C. (2008). Integrated Riparian Assessment For Tembec in the East Kootenay, British Columbia Operating Areas: Volume 6: Detailed Riparian Assessment for the North Elk Region. Prepared for Tembec Inc., Cranbrook, B.C.
  • Green, K.C. (2008). Integrated Riparian Assessment For Tembec in the East Kootenay, British Columbia Operating Areas: Volume 7: Detailed Riparian Assessment for the South Elk Region. Prepared for Tembec Inc., Cranbrook, B.C. (http://www.for.gov.bc.ca/hfd/library/FIA/2009/LBIP_4885004g.pdf)

  • Forsite, Apex Geoscience and Pandion Ecological Research Ltd (2006). Integrated Riparian Assessment for Tembec in the East Kootenay, British Columbia Operating Areas: Volume 1: Strategic Overview & Budget Calculations. Prepared for Tembec Inc. Cranbrook BC (http://www.for.gov.bc.ca/hfd/library/FIA/2006/LBIP_4439003.pdf)

If you have any other questions, please contact us

Contact Us